Run Step to Smartsheet Sync

Automatically push ION run step status and timestamps to a Smartsheet row when a run step is updated.

How It Works

When a run step is updated in ION, this integration finds the matching row in your Smartsheet by looking for the step's URL in the configured URL column, then writes the step's status, check-in time, and completion time to the mapped columns.

Prerequisites

  • The Smartsheet must have a column containing the ION run step URL (e.g., https://app.firstresonance.io/runs/123/steps/456). The integration matches rows by the /steps/{stepId} portion of the URL, so the cell just needs to contain that segment — the full URL is recommended for clarity but not strictly required

  • Run Step Sync Enabled must be set to true on the Run Step Sync config page

Configuration

All settings are on the Run Step Sync config page.

Setting
Default
Description

Run Step Sync Enabled

false

Master switch for this flow. Must be true to enable syncing.

Run Step Smartsheet Sheet

(required)

ID of the Smartsheet sheet to sync into. This should be a different sheet than the one configured in Run Sync — run steps track individual step progress, not the run itself.

Run Step URL Column

Run Step URL

Name of the column in Smartsheet that contains the ION run step URL. Used to match rows.

Run Step Column Mapping

See below

Maps Smartsheet column names to ION run step fields.

Default Column Mapping

Smartsheet Column
ION Field

Status

status

Check In

startTime

Completed

endTime

You can rename the Smartsheet columns and update this mapping to match. Valid ION field names are status, startTime, and endTime.

Data Written

ION Field
Value Written
Format

status

Run step status

Underscores replaced with spaces (e.g., IN_PROGRESSIN PROGRESS)

startTime

When the step was checked into

YYYY-MM-DD in the configured timezone

endTime

When the step was completed

YYYY-MM-DD in the configured timezone

Only non-null values are written. If a step has no start time yet, that column is left unchanged.

Row Matching

The flow scans the sheet for rows where the Run Step URL Column contains /steps/{stepId}. If multiple rows match, all are updated.

Timezone

Dates are formatted using the Timezone setting on the Settings config page (default: America/Los_Angeles). Set this to your local IANA timezone (e.g., America/New_York, UTC) to ensure dates display correctly in Smartsheet.

Troubleshooting

Symptom
Likely Cause

Row not updated

The URL column name doesn't match Run Step URL Column, or the cell doesn't contain the full step URL

Dates in wrong timezone

Timezone setting on the Settings page is incorrect

Flow not running

Run Step Sync Enabled is false

Row not updated after pasting a URL and updating a Run Step.

Smartsheet may not have persisted the cell value yet — if the step is updated in ION immediately after pasting the URL, Smartsheet may still be saving on their end. Wait up to 2 minutes after pasting the URL before triggering a step update.